Aurora Baycare

Green Bay, WI

Unique Features

The project was phased and sequenced to allow continuous operation of the Owner's services to its patients. Constant diligence in infection control was primary to maintaining patient satisfaction throughout the project.

Scope of Work

The project was a renovation of the existing third floor to provide a Cardiac Catheterization lab. Included are demolition of existing locker rooms, preparation of the new lab space for the new equipment, and new finishes.

Maintenance

Howard Immel is proud to be the selected contractor for Baycare Medical Center's maintenance needs. We strive to provide these services to the hospital without disrupting operations while maintaining the highest level of professionalism. This work included the following projects:

  • PET/CT Scanner Replacement.
  • Fire Separation Coiling Fire Shutters
  • Surgery Department & Corridor Wall Protection
  • Central Supply Remodel
  • Suite 310 Registration Station Remodel
  • Plumbing System Analysis
  • Firestopping Upgrade
  • Physician's Lounge
  • Pharmacy Remodel
  • West Side Clinic Remodel
  • Emergency Department Nurse Station